• Home
  • Design Guidelines
  • Title Updates
  • Lot Details
  • Application
  • Contact

  • Home
  • Design Guidelines
  • Title Updates
  • Lot Details
  • Application
  • Contact

Design Assessment Form

Please ensure that you have read all the information prior to submitting the application. Both the builder and the owner will be updated on the progress of the application via the email addresses provided below.

Already Submitted an application? Log In

Owners details

Owners email address will be used for communication and updates on the application
Owners Name(Required)
Owner's mailing address

Builders details

Builders Contact(Required)
Will be used for communication and updates on the application
Builder's mailing address

House/Structure Details

Name/description of house/facade design

Front of Lot Landscaping

Refer to landscaping e-brochure for indicative designs and plant species.
Landscape Request(Required)
Note: we do not customize gardens on request. The installation is in accordance with the style chosen, species’ availability & suitability at time of installation and the geometry of your lot.
Selected landscape style
Colour palette
Mirvac will inspect your lot and will endeavour to install your selected landscape within 3 months of receiving your Certificate of Occupancy, provided you have complied with all requirements.
Acknowledgement(Required)
  • Driveway complete
  • All required earthworks complete
  • Retaining walls complete (if applicable) and in accordance with the Design Guidelines, section 10.3. (If batter is to be used,
    it should not be more than 1:6 gradient - consult your builder or architect).
  • Irrigation syåstem installed (if applicable) – please provide as-constructed plans
  • Landscape area levelled to 100mm below driveway level in preparation for top soil
  • External water tap and adjacent external power supply installed as per Design Guidelines, section 11.2.2
  • All site rubbish removed
  • Garage door installed
  • Porch and footpaths complete
  • Fencing installed
  • Letterbox installed
  • Drainage Infrastructure installed (as required)
  • NBN Co. street connection completed
  • Clear access to area in which works will be undertaken

Document Submission

Provide all documents. If any are not provided, it will delay your process.
Documents(Required)
Tick off each document as you upload it below
Drop files here or
Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg, Max. file size: 400 MB.
    Drop files here or
    Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg, Max. file size: 400 MB.
      Drop files here or
      Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg, Max. file size: 400 MB.
        Drop files here or
        Accepted file types: pdf, doc, docx, txt, jpg, gif, png, zip, eml, msg, Max. file size: 400 MB.
          Please include any notes / additional information

          Acknowledgement

          By submitting this application form to Mirvac I acknowledge the following:(Required)

          © 2026 Olivine

          • Conditions of Use
          • Privacy Policy

          Niche Studio